From:                              route@monster.com

Sent:                               Monday, October 26, 2015 10:55 AM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: drive tseter

 

This resume has been forwarded to you at the request of Monster User xapeix01

Lee Stewart 

Last updated:  04/26/15

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Alpharetta, GA  30005
US

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Lee Stewart Updated Resume 2015.doc

Resume Value: vv2yu99n7pc9gvdy   

  

 


 

Call NIC for pre/post alarm site checks.
Installations during maintenance window.
UMTS 3106/3206/3418/3518.
Took pre/post site pictures for COP.
Call tested each sector locking down on carrier frequency and scrambling codes.
Project also included the installation of battery packs in 3106 cabinets.
Upgrading power from +/-24V to +/-48V.
Installed 3206 cabinets inside shelter.

Field Supervisor, 12/2011 to 05/2012

Ericsson/T-Mobile/Claro through Tangent San Juan, PR

Responsible for the day to day coordination of contractors/vendors while they finished final punch
lists and site walks. Coordinating QC/QA. Took detailed notes on status of site completion.
Made sure COP's were completed to Ericsson/T-Mobile standards.
Integrated 1st and 2nd carrier UMTS equipment for Claro/PRT.
Preformed tiger team duties, getting sites integration ready.
Antenna/RRU swaps.
Supervised delivery and shipment of second carrier equipment. Signed delivery documents.
Supervised equipment installation to completion.

Field Supervisor, 01/2011 to 07/2011

Ericsson/AT&T through Astron Consulting Dallas, TX

 

Integrated UMTS 3106 and 3206 cabinets.
Follow Ericsson MOPs, test plans. EMAS tool.
Installed RAX/TX60 cards into 3206 UMTS cabinets along with second carrier radios and filters
Repositioned RF jumpers for LTE
Installed SIAD, Microwave Units, Fiber, GPS receivers and GPS.
Integrated cell site after each complete install. DUL scripting.
Uploaded screenshots into DAM tool, Site Handler.

Project Manager, 06/2010 to 11/2011
New World Technology, Inc. Raleigh, NC

Scheduling the project in logical steps and budget time required to meet deadlines.
Inspect and review projects to monitor compliance with building and safety codes, and other regulations.
Explained plans and contract terms to administrative staff, contractors, and clients, representing the owner or
developer.
Prepared new contracts and negotiated any needed revisions, changes and additions to contractual
agreements with architects, consultants, clients, suppliers and subcontractors.
Obtain all necessary permits and licenses in order to gain access to property.

Site Audit/Survey Technician, 05/2010 to 06/2010
Rightech Raleigh, NC

Provided detailed site drawing of all carriers inside compound.
Recorded current power readings from designated meter.
Took pictures of all site equipment that was being used.
Used an Excel spreadsheet with a power calculator to determine the total amount of power being else by each
cell site.

Field Technician, 03/2010 to 05/2010
Avion Systems New York

Installed RAX/TX60 boards for nationwide upgrade for cabinet types 3106, 3206, 3418, and 3518.

Clearwire Signal Pathing Technician, 04/2008 to 12/2008


 

Clearwire Wireless through Teksystems Greensboro-High Point-Winston Salem, NC

Responsible for installing and programming Dragonwave's Horizon Duo Modems, Ceragon Modems,
Orthogons, and PTP600/400 Microwave equipment.
Powered up Clearwire Equipment  by running a power cable (-48V) from the breaker box back into
the cabinet.
Duties included contacting the NOC to fix trouble tickets and outages during maintenance windows.
Uploaded company provided scripts that contained frequency, capacity, and TX Power information.
Achieved target RSL levels that were within a -2dBm error margin.
Worked with Commissioning to bring new build and existing sites on air.
Provided customer support by going on truck rolls to customer residences troubleshooting Clearwire
modem issues.

Did some work at the local warehouse with inventory record keeping.
Trained new technicians coming into market. CPP certified.

Cell Site Technician, 04/2007 to 12/2007
Clearwire wireless Broadband through Teksystems Albany Syracuse Rochester, NY

Troubleshoot T-1's
Maintain the system through standardized preventive maintenance procedures
Verify cell sanity
Perform preventive maintenance tests
Ensure all regulatory specs are followed
Test Microwave Links between sites
Perform drive tests (cluster drives) Verifed that channel allocation was correct
Verifed hand-off parameters were operating correctly,
Conduct new Installation turn-up Install new cell sites

Install equipment at staging area test grounds before turn up

Run limited tests on cell site

Surveyed service area with signal strength indicator Coordinated the installation of the base station Telco

Worked with Switch Technicians turning up and upgrading cell sites

Calibrate base station power levels and perform antenna sweep tests Coordinate work with construction team

and contractors for cell site upgrades, installation and maintenance.

Drive Tester, 02/2007 to 03/2007
Cingular Wireless through Glotel Indianapolis, IN

Used CLARIFY/CLARIFY VIEWER with PCTEL scanner box
Tested for several different channel frequencies and their strengths from the surrounding towers
Drove pre-approved routes in the testing city
Worked closely with RF Engineers organizing data

Field Test Engineer, 11/2006 to 12/2006

Motorola/Alltel through Solutelia Little Rock, AR

Collected Data using new EVDO Software/Andrews Invex 3G/CDMA.
Preformed SCFT testing.
Worked closely with RF Engineers analyzing data.
Tested for hard and soft handovers during cluster drives.
Went to each sector of the BTS and tested upload and download speeds.
Responsible for making sure that each cell tower was on new EV-DO network.
Surveyed area for possible future cell site tower locations in areas of poor coverage.

Cell site Technician, 09/2006 to 10/2006
Sprint/Nextel through Byers Engineering, Inc. Laurel, MD


 

Collected site survey information.
Recorded cell site height, platform dimensions.
Provided client with any possible maintenance issues or damage to cell site compound/tower.

Drive Test Support Specialist, 03/2006 to 09/2006

True Position Inc Berwyn, PA

Cingular/T-Mobile) Responsible for the drive testing and the initiation of the optimization of E-911 markets.
Travel to various markets to train drive testers.
Design test routes, test points, and test plans.
Provide support to drive testers, field engineers, and optimization engineers daily with their hardware,
software, and logistic issues.
Use MapInfo to plot routes, test points, sites, and problem areas.
Supervise drive testers locally and remotely.
Able to maintain multiple markets at one time.
Troubleshoot drive testing equipment (DTT- Drive Test Tool) and accuracy issues.
Gather and analyze location accuracy/E911 data (through the use of SCOUT, TEMS, and DTC-Drive Test
Client).
Compile accuracy packages after markets have been optimized and are ready to be turned over to the
customer.

03/2005 to 11/2005

Drive Test Technician, 01/2005 to 03/2005

Voice Stream Oklahoma City, OK

Voice Stream Used TEMS Investigation for finding areas of high interference, dropped calls and poor coverage
Worked with RF Engineers analyzing data
Trained new employees on TEMS Investigation
Performed System and Cluster drives in GSM system.

QC Test Engineer, 06/2004 to 07/2004
Nortel Networks PK Diversified Sacramento, CA

As team leader administered supervision for Nortel cutover Test procedure to check for proper system
parameter setup for CDM network
Completed RF data collection for evaluation of the optimization call-success rate, call initialization failure rate,

and dropped call rate

Ran test on TRU and TRU3s using Pro Comm-Plus to check and monitor alarms and cabinet systems

Troubleshot, diagnosed and repaired problems with the NT800 to bring back to operational standards CDMA

Responsible for system integration and commissioning of URBAN and Macro Stations Executed test on T1

transmission.

Drive Test Technician, 05/2004 to 06/2004

Triton PCS, Market Data Collector,

Collected performance data from the major competitors in Triton PCS markets using the Ericsson TEMS
Benchmaker unit.
Performed cluster and system drives in GSM Network.

Education

Electrical Engineering: 2003

Forsyth Technical Community College - Winston Salem, NC

 

LEE STEWART

1050 Cambridge Square, Suite C, Alpharetta, GA 30009 Home: 470-255-8742  leemstewart@yahoo.com

Professional Summary

Telecommunications Specialist dedicated to continuous process improvement in the face of rapidly evolving and

changing markets. Extremely results-oriented and proactive in addressing and resolving problems.

Skills

Efficient multi-taskerEffective leader
Project managementFast Learner
Conflict resolutionNot afraid to try new things
Customer service-orientedOrganized
Deadline-oriented

Work History

National Cell Site Acceptance Lead/PMO, 01/2013 to 12/2014

Alcatel-Lucent/Sprint through MPI Industries Nationally Located

 

QC all cell site final acceptance submissions to Sprint.
Responsible for the acceptance review of all Sprint's new 2.5 Commissioning and Integration Close-Out
Packages
Team lead over COP/SAF review.
Acquired extensive knowledge of Sprint's Siterra database.
Assisted ALU Financial team each month with vendor submitted offline SAF's.
Processed COR's.
Identified correct pricing for all OOS items.
Reviewed As-built/Red-lined CD's as needed.
Oversaw Temp Acceptance In-flight and CCSA submissions to Sprint.
Worked directly with the field CM's and the GC's to ensure the each cell site was built to exceed industry
standards

Managed multiple tiger teams on Blitz cleanup project.
Requested revised RFDS and TTDS from RF team as needed.
Trained CM's and GC's on the processes involved in completing closeout packages.
Stressed the importance of safety and quality during site builds.

Field Construction Manager, 05/2012 to 12/2012
Alcatel-Lucent/C-Spire through MPI Industries Jackson, MS

Scheduled pre-con walks with GC's to identify any pre-existing conditions prior to construction start.
Held safety meetings, inspected all permits, and made sure that all equipment used on the tower was in proper
working condition.
Sign completed JSA forms.
Identified any OOS items to be addressed during construction.
Daily conference calls with ALU market lead for site construction statuses and SAP approvals.
Due to the large military presence in Jackson, had to obtain any special clearances/permits needed to gain
access to government restricted areas.
Created BOM's for each site to be built and uploaded doc to FST.
Reviewed all closeout documentation and photos.
Held punch walk meetings with GC, signed red-lined CD's.
Once a site has passed at construction and safety standards, a site walk with the customer was scheduled and
site was handed over to them.

Field Engineer, 05/2012 to 05/2012
Avenger Engineering Atlanta, GA

Installed 1C/2C kits with RU/FU/RAX/TX60 boards for nationwide upgrade.
Used EMAS tool to get COP screenshots of the alarm list, CV/Upgrade list, and license key with fingerprint.



Experience

BACK TO TOP

 

Job Title

Company

Experience

National Construction Manager

Sprint

- Present

 

Additional Info

BACK TO TOP

 

Current Career Level:

Manager (Manager/Supervisor of Staff)

Work Status:

US - I am authorized to work in this country for any employer.

 

 

Target Job:

Target Job Title:

Manager

Desired Status:

Full-Time
Part-Time
Per Diem

 

Target Company:

Company Size:

 

Target Locations:

Selected Locations:

US

Relocate:

Yes

Willingness to travel:

Up to 75% travel